Property owners and investors
- Fuel stations, malls, hotels, hospitals
- Fleet depots and logistics parks
- Land owners and investment groups
We help property owners, investors and manufacturers choose the right sites, secure grants and subsidies, and deliver charging projects from first study to switch-on. In the United States and India.
Use a single service, or hand us the whole project. Either way, you deal with one experienced team.
Find the right location for your next charging investment. We study traffic, parking time, nearby demand, power supply and competition, then rank your options.
Make your investment go further. We find the government, utility and local programs your project qualifies for and combine them where the rules allow. Some programs cover up to 80% of eligible costs.
Power planning, site layouts, equipment specifications, drawings and 3D models, prepared to the standard that utilities and agencies expect.
Complete, well-organised applications: project description, budget, schedule, site and power evidence, and answers to the agency's follow-up questions.
The right chargers, installers and software for your site. We compare suppliers on specifications, certifications, delivery time and warranty.
We coordinate the utility, landlord, agencies, suppliers and contractors, and send you a short weekly update until the chargers are running.
We review your site or idea and tell you plainly whether it is worth pursuing, and why.
Budget, timeline and the right mix of grants and subsidies, checked line by line.
Layouts, specifications and trusted equipment and installation partners.
We manage approvals, purchasing and installation through to switch-on.
EV charging infrastructure in the United States. NeoElectrify supports Ampaway with funding research, grant applications, product engineering and project coordination.
We are building a network of reliable manufacturers, installers, software providers and financiers for projects in the United States and India.
We are hiring four people for our Hyderabad office. Full time, hybrid, working on real infrastructure projects for international clients.
Research funding opportunities, analyse business data, and prepare grant applications, proposals and business cases.
Create and maintain the engineering records used to qualify EV charging products, including 3D models, drawings and renderings.
Lead day-to-day delivery: plan the team's work, check quality, and keep clients informed.
Fill in the form and we will reply within two business days. There is no cost or obligation for a first conversation.
Clear explanations of EV charging, funding and site planning. Written by the NeoElectrify team and reviewed regularly.
If you own a property or are thinking about investing in EV charging, this guide covers the basics in plain language: the kinds of chargers, the plugs, how long charging takes, and what matters most when choosing a site.
An electric vehicle stores energy in its battery, measured in kilowatt-hours (kWh). A charger delivers power, measured in kilowatts (kW). The more kW a charger delivers, the faster the battery fills, up to the limit the vehicle can accept.
There are two kinds of charging. With AC charging, the charger supplies alternating current and the car's built-in converter turns it into battery power. That converter is small, so AC charging is slower. With DC fast charging, the conversion happens inside a large charger, which sends power straight to the battery. That is much faster, and also much more expensive to install.
| Type | Typical power | Adds roughly | Best for |
|---|---|---|---|
| Slow AC US: Level 1 · India: home socket | 1.4–3.3 kW | 8–20 km of range per hour | Homes, overnight parking, two-wheelers |
| AC charger US: Level 2 · India: AC Type 2 | 7–22 kW | 40–100 km per hour | Offices, hotels, malls, apartments, fleet depots |
| DC fast charger | 30–350 kW | A 20–80% charge in about 20–60 minutes | Highways, fuel stations, fleet hubs, busy city sites |
Range figures are approximate and depend on the vehicle. Many cars accept AC power at 7–11 kW, even if the charger can supply more.
| United States | India | |
|---|---|---|
| AC charging | J1772, and increasingly NACS (SAE J3400) | Type 2 |
| DC fast charging | CCS1, with NACS (SAE J3400) now being adopted by most carmakers | CCS2 for cars; some older cars use other plugs |
| Two- and three-wheelers | Not common | Light EV connectors approved by BIS, plus battery swapping |
For a public site, choose equipment with the connectors most local vehicles use. A good supplier will also support the open charging protocol OCPP, so you can change software providers later without replacing hardware.
A simple estimate: energy needed divided by charging power.
Car with a 60 kWh battery, charging from 20% to 80% = 36 kWh needed
On a 7.2 kW AC charger: 36 ÷ 7.2 ≈ 5 hours
On a 60 kW DC charger: about 40 minutes, allowing for slowdown near full
Fast charging slows down as the battery fills, which is why most fast-charging sessions stop around 80%.
Not sure what suits your property? We can review your site and tell you what makes sense, at no cost for the first conversation.
India's EV market is growing quickly, and the government has made it much easier to set up public charging. But a charger in the wrong place stays idle. Here is what we look for when we assess a site in India.
Most electric vehicles on Indian roads are two-wheelers and three-wheelers (e-scooters and e-autos), followed by cars, taxis, delivery fleets and electric buses. Each group charges differently:
The best sites are places where vehicles are parked anyway, for a length of time that matches the charger.
| Location | Typical stay | Good fit |
|---|---|---|
| Highway fuel stations, dhabas and food plazas | 20–45 minutes | DC fast chargers |
| Malls, cinemas, hospitals | 1–3 hours | AC chargers, some DC |
| Offices and IT parks | 6–9 hours | AC chargers |
| Residential societies and apartments | Overnight | AC chargers with separate metering |
| Metro stations, bus depots, municipal parking | Varies | Mixed, often eligible for subsidy |
The electricity connection from the DISCOM is usually the deciding factor. Before anything else, find out:
The Ministry of Power's 2024 guidelines help here. Charging stations can take a separate metered connection with a dedicated EV tariff, sub-metering behind an existing connection is allowed, and DISCOMs face regulator-set penalties for delays in providing connections. Each state also has a State Nodal Agency to coordinate with DISCOMs.
If you do not own suitable land, government and public land can be made available on a revenue-sharing basis. Under the guidelines, the land-owning agency receives ₹1 per kWh of electricity sold, paid quarterly. Private land owners can use a similar model through bidding.
The guidelines aim for at least one public charging station in every 1 km × 1 km grid in cities by 2030, stations about every 20 km on both sides of highways and major roads, and fast chargers for long-range and heavy vehicles about every 100 km. Sites that fill gaps in this plan are more likely to find support and steady users.
The PM E-DRIVE scheme sets aside about ₹2,000 crore for public charging. Under the operational guidelines issued in September 2025:
Eligibility, application windows and allocations change, so confirm the current rules before planning around a subsidy.
Have a property in India that might suit EV charging? Send us the location and we will tell you what kind of charging makes sense.